Facts
Sunrise Communications AG (respondent) intends to erect a mobile telecommunications installation on the roof of the building at Jägerweg 27 (parcel No. 1647) in the W2 residential zone of the City of Thun. A first building application from 2005 (antenna support 3 m high with six combined antennas and two directional radio antennas on the roof ridge) was rejected on aesthetic grounds by the Administrative Court of the Canton of Bern in its decision of 31 March 2009; this decision is final.
A second building application dated 14 October 2009 was rejected by the City of Thun on 11 February 2010. The Directorate of Construction, Transport and Energy of the Canton of Bern (ACI) annulled this decision on 5 May 2010 and remitted the matter to the City for continuation. After a stay of proceedings, Sunrise submitted amended project plans on 29 June 2012: one approximately 1.8 m high tube antenna with integrated UMTS antennas on each of two roof surfaces, and one directional radio antenna on the northern half of the roof. The City treated this as a project amendment, published it twice and approved it on 8 July 2013 subject to conditions.
The objectors filed an appeal with the ACI, which obtained a expert report from the cantonal Commission for the Preservation of Townscapes and Landscapes (OLK), supplemented the permit with conditions regarding colour scheme and acceptance measurements at three OMEN, and otherwise dismissed the appeal. The Administrative Court dismissed the appeal on 1 September 2015.
The appellants (residents, represented by counsel) lodged a public law appeal with the FSCA. They requested that the building project of 29 June 2012 not be considered, alternatively that the building permit be refused, and subordinately that the matter be remitted for an on-site inspection and new assessment. The respondent, the Administrative Court and the City of Thun requested dismissal of the appeal. By order of 29 October 2015, suspensive effect was granted to the appeal.
The disputed issues are in particular: (1) whether the amended project was to be treated as a project amendment or as a new building application, and whether the missing signature form of the property owner constitutes a defect; (2) whether the waiver of a renewed on-site inspection violated the right to be heard; (3) whether the integration of the antennas into the townscape was assessed arbitrarily.
Considerations
The public law appeal is admissible against the final cantonal decision of the last instance (Art. 82 lit. a, 86 para. 1 lit. d, 90 FSCA). The appellants are entitled to appeal as residents (Art. 89 para. 1 FSCA). The complaint of violation of fundamental rights, including arbitrary application of cantonal law, is only examined insofar as it is raised with adequate reasoning (Art. 106 para. 2 FSCA). New facts and evidence are only admissible insofar as the decision of the lower court gives cause for them (Art. 99 para. 1 FSCA).
On the question of project amendment: the Administrative Court left open whether this was a project amendment or a new building application, since publication with the possibility of objection had taken place and the applicable provisions had not changed. The appellants only complain of the missing signature form of the property owner. Whether this complaint is sufficiently substantiated and admissible remains open, since in any event it does not demonstrate arbitrariness: the signature requirement is intended to prevent applications being processed that can never be implemented for lack of the property owner's consent. The file shows that the property owner signed both the original application and the amended plans.
On the right to be heard and the on-site inspection: the Administrative Court had already carried out an on-site inspection on 4 November 2008, which was recorded in minutes and documented photographically. The appellants themselves had requested the consultation of the prior files and submitted their own photographic documentation. The changes made since then (relocation of power lines, street lamps) were partly foreseeable and were taken into account; the house at Fischerweg 49 was already classified as a listed building. The project changes follow from the plans and photomontages. Waiving a renewed on-site inspection is not objectionable from the standpoint of the prohibition of arbitrariness and the right to be heard.
On the factual complaints: no review is available…