Facts
In judgment 1C_4/2015 of 13 June 2018, the First Public Law Court of the Federal Supreme Court rules on a public law appeal against the judgment of 11 November 2014 of the Cantonal Administrative Court of the Canton of Ticino, which annulled the building permit issued for a structure in the agricultural zone.
The appellant (A.A.), who manages an agricultural holding, requested on 28 February 2013 from the Municipality of Faido authorisation for a removable metal tunnel, covered with tarpaulin, measuring 14 m by 7 m and 3 m high, intended for storing hay bales used as fodder for the animals. The structure was planned on the boundary with the land of the objecting neighbour (B.), which is also located in the agricultural zone. The neighbour had objected, complaining of non-compliance with the minimum distance from the boundary.
By decision of 3 June 2013, the Municipality issued the permit and dismissed the objection; the Cantonal Government confirmed this on 20 August 2013. The Cantonal Administrative Court upheld the neighbour's appeal, annulling the governmental decision and the permit, because the structure did not comply with the 4 m distance from the boundary provided by the implementing rules of the zoning plan for the craft zone, applied by analogy to the agricultural zone.
The appellant requests the annulment of the cantonal judgment and confirmation of the building permit, alleging violation of federal law, arbitrariness in having assimilated the agricultural zone to the craft zone, and violation of the separation of powers. The neighbour requests dismissal of the appeal; the Cantonal Government defers to the federal court's judgment; the Federal Office for Spatial Development (USTE) considers that, if the distance from the boundary did not preclude the project, it would be necessary to verify compliance with art. 34 para. 4 SPO.
Considerations
The public law appeal is admissible (art. 82 let. a, 86 para. 1 let. d, 90 and 100 para. 1 FSCA) and the appellant has standing (art. 89 para. 1 FSCA). The Federal Supreme Court applies the law of its own motion (art. 106 para. 1 FSCA) and may uphold or dismiss the appeal on grounds other than those raised by the parties or the lower court. In the cantonal proceedings, the project's conformity with the agricultural zone was not contested: the only point in dispute was the distance from the boundary. Since the structure lies outside the building zone, however, the cantonal courts should also have examined the application of federal law.
As regards conformity with the agricultural zone (art. 16a SPA, art. 34 para. 4 SPO), the Federal Supreme Court notes that the justification for the project rested solely on a brief preliminary opinion of the Agriculture Section, which contained no data on the need for the new structure, the choice of location, the sizing in relation to the current and future needs of the holding, the possible use of existing structures, or the prospect of the holding's long-term existence. The necessity criterion requires that buildings be adapted to the objective needs of the agricultural activity and not oversized, and that the holding be viable in the long term; verification of this requires technical, economic and financial analysis. The failure to examine these conditions would already have required annulment of the governmental decision.
As to the distance from the boundary, the Federal Supreme Court criticises the cantonal reasoning. To fill a gap, it is necessary to distinguish, through interpretation (literal, historical, teleological and systematic), between a genuine gap, which the judge must fill under art. 1 para. 2 CC, and a qualified silence of the legislator, which the judge cannot supplement. The cantonal court did not carry out this analysis, limiting itself to asserting that it was not justified to privilege structures outside the building zone over those within the building zone. This is wrong: agricultural zones are substantially regulated by federal law (art. 16 SPA), are in principle non-buildable, and are subject to the principles of keeping land free of construction and of concentration. In the…