Facts
The respondent ([D.] ) operates a farm in Weinfelden and Bussnang (district Rothenhausen) with fodder and arable farming as well as dairy cattle husbandry. At the beginning of 2012 the farm comprised 119 animals, including 66 dairy cows, and a cultivated area of approximately 42.79 ha (owned and leased land). The farm employs one full-time and one part-time employee.
The farm has two sites: the farm centre (Sangenhof) in Weinfelden, partly in the residential zone W3 and partly in the agricultural zone, and the Lindenhof in the agricultural zone of Rothenhausen. According to the farm concept of 23 January 2012, the farm centre is to be relocated to Rothenhausen in the medium term.
A first building application from 2009 for a machine shed at the Lindenhof was set aside by the Department of Construction and Environment (DBU) of the Canton of Thurgau; the decision has become final. On 12 January 2012 the respondent submitted a revised building application for a machine shed and a separate workshop. The cantonal Office for Spatial Development confirmed conformity with the zoning plan, and the municipality of Bussnang granted the building permit on 3 September 2012. The appellants (A. and B. [C.] ), owners of a neighbouring parcel, filed an appeal. The DBU dismissed it on 30 May 2014; it considered the buildings to be somewhat too large, but allowed a certain reserve capacity, regarded the rental of machinery through [E. AG] as subordinate, and considered an extension in Weinfelden not possible because of the residential zone.
The Administrative Court of the Canton of Thurgau dismissed the appeal on 2 September 2015. The appellants lodged a public law appeal with the Federal Supreme Court and requested the annulment of the lower court's decision and the rejection of the building application. The Federal Office for Spatial Development (ARE) requested remittal for further clarification of the facts. By presidential order of 20 November 2015, the Federal Supreme Court granted the appeal suspensive effect.
The subject matter of the dispute is the zoning conformity and necessity of the planned machine shed and workshop (Art. 16a SPA, Art. 34 SPO), in particular their dimensioning, the stock of machinery, the activities of [E. AG] (contract work, agricultural trade) and the choice of location in Rothenhausen rather than Weinfelden.
Considerations
The appeal is in principle admissible, as the appellants as neighbours have standing to appeal (Art. 82 let. a, Art. 86 para. 1 let. d, Art. 89 para. 1 FSCA). The complaint of violation of the right to be heard concerning the disclosure of detailed accounts of the annual financial statements is inadmissible, as the appellants do not specifically explain which figures would have to be published (Art. 106 para. 2 FSCA).
Under Art. 16a para. 1 SPA and Art. 34 paras. 1, 2 and 4 SPO, buildings in the agricultural zone are zoning-conforming if they serve soil-dependent cultivation and are necessary for it, no overriding interests oppose them, and the farm can continue to exist in the long term. Necessity is assessed according to objective criteria; a new building is excluded if the use could be accommodated in an existing building, and its size and location must correspond to the objective operational needs, i.e. it must not be oversized. It must further be examined whether new buildings replace existing buildings that are no longer needed and whether their dismantling can be ensured. Future needs are only to be taken into account if they are established with some degree of certainty and are documented by a farm concept; mere declarations of intent are not sufficient, although a certain operational reserve is permissible.
The Federal Supreme Court first criticises the absence of an overall assessment of the farm. The farm concept provides for centralised housing of the machinery at the Lindenhof; existing buildings may thereby be functionally replaced. The lower court did not investigate this, so there is a risk that overall more building volume is created than is necessary.
The benchmark values of the FAT report No. 590/2002 are only starting values, which as a rule must be refined by a detailed machinery inventory and a storage concept or by an on-site inspection with the involvement of specialists. The lower court disregarded the workshop area (486 m2 new, together with 80 m2 existing, 566 m2) in its calculation, although the benchmark of the KOLAS for workshops generally provides only 40 m2 and deviations must be justified. Furthermore, it has not been established which vehicles are actually still in use; only vehicles actually used can justify an objective space requirement, not vintage cars and retired tractors.
According to case law, the operational reserve of 25 % refers to livestock units and not to machinery and equipment, so no general surcharge on the standard values can be derived from it. A declaration of intent regarding farm growth in the farm concept is not sufficient for a secured future need. If the farm centre is relocated, a somewhat larger building volume may be permissible for a transitional period, provided that subsequent dismantling is ensured.
Regarding the complaint concerning [E. AG] , the Federal Supreme Court notes: contract work for third parties against payment does not establish a direct functional relationship with the farm; such contracting…