Facts
The appellants, [A.A.] and [B.A.] , are co-owners in equal shares (northern part), together with their daughter, of parcel No. 507 of the land register of the Commune of Etagnières. Holding a building permit issued on 15 January 2008, they undertook the construction of two adjoining villas on this parcel.
On 4 July 2013, at the request of the respondent [C.] , owner of neighbouring parcel No. 846 located immediately to the north, the Municipality of Etagnières ruled on works carried out without authorisation. It authorised a structure supporting solar panels and allowed the car shelter to remain on the north and west sides of the parcel, but refused covering the linking element between the shelter and the building with a roof.
Seized of an appeal by the respondent, the Administrative and Public Law Court of the Vaud Cantonal Tribunal reformed the municipal decision and ordered the owners: (i) to demolish the northern car shelter and to level the land along the northern boundary in continuity with parcel No. 846, at an altitude of 643.15 m; (ii) to demolish the installations located under the photovoltaic panels, which may only be reinstalled under a new authorisation issued following a procedure respecting the neighbours' right to be heard.
The appellants lodge a public law appeal and request the annulment of the cantonal judgment and the confirmation of the municipal decision, or alternatively the referral of the matter back to the cantonal court. The cantonal court concludes to dismissal, the Municipality of Etagnières to admission, and the respondent to dismissal. By order of 13 October 2015, suspensive effect was granted to the appeal.
Main issues in dispute: arbitrariness and violation of good faith and proportionality as regards the order to demolish the northern shelter and restore the land; arbitrariness of the municipal regulation, violation of art. 18a SPA and of proportionality as regards the order to demolish the installations under the solar panels; the participation of the co-owner who was not a party to the proceedings.
Considerations
The Federal Supreme Court holds that the appeal is admissible as a public law appeal (art. 82 let. a, 86 para. 1 let. d and 90 FSCA), the appellants, being particularly affected by the demolition, having standing under art. 89 para. 1 FSCA. It rules on the basis of the facts established by the previous authority (art. 105 para. 1 FSCA) and reviews the interpretation of cantonal and municipal law only from the angle of arbitrariness. Appellate criticisms of the facts are inadmissible. The guarantee of property (art. 26 para. 1 Cst.) may be restricted under the conditions of art. 36 Cst., in particular compliance with proportionality.
As regards the northern shelter and the height of the land, the cantonal court held that the floor space index was largely exceeded, that no authorisation had become enforceable before the proceedings, the 2008 permit making the exterior works subject to approval of a detailed plan, and that the supplementary permit of 2010 referred to that permit. The appellants interpret the decision of 1 June 2010 in an appellate manner as authorising earthworks up to the property boundary and a fence; this extrapolation cannot be followed, since the decision only limited earthworks to 80 cm and walls or barriers to 2 metres. The fact that the respondent only reacted at the end of the works changes nothing, as she could assume that the land would still be levelled. The complaint of arbitrariness is unfounded.
Concerning the shelter, the approval in principle of the extension of the shelter between the northern parking spaces and the building was imprecise, notably as to the roof and the height of the land, and the architect had planned spaces without cover. It is therefore not arbitrary to consider that no authorisation in due and proper form was in force. Good faith cannot be invoked, the appellants never having submitted clear plans approved in their entirety and having themselves created the uncertainty. The conditions for revocation are irrelevant.
As regards the installations under the photovoltaic panels, the municipal provision only governs the siting of solar collectors and not the structures supporting them; the appellants' interpretation, allowing derogation from the floor space index and boundary distances for any single-storey…