Facts

The local development plan (plan localisé de quartier, PLQ) no. 29'270, adopted by the Council of State of the Republic and Canton of Geneva on 27 October 2004, provides for the construction of six residential blocks along avenue Edmond-Vaucher, in Vernier, in zone 5 de développement 3. Buildings 13, 15 and 17 have already been built.

The State of Geneva owns parcel no. 5'357 (2'864.5 m2), at the corner of avenue Edmond-Vaucher and chemin du Coin-de-Terre, on which the fourth block is to be erected. The PLQ allows a gross floor area (surface brute de plancher, SBP) of 3'581 m2, a floor space index (indice d'utilisation du sol, IUS) of 1.25, and limits the building envelope to three storeys above ground floor (R+3).

On 27 November 2012, the C. Foundation (the respondent) applied for a building permit for four HBM (habitations à bon marché, low-cost housing) buildings with an underground car park, at nos. 19 to 19C avenue Edmond-Vaucher. The project provides, in derogation from the PLQ, for a fourth storey allowing thirteen additional dwellings and a reduction in construction costs per apartment.

The State departments issued opinions that were either favourable or favourable subject to conditions. On 31 October 2013, the Directorate of Development Plans and Applications (Direction des plans d'affectation et requêtes, PAR) considered that a R+4 building was admissible, the construction of housing constituting a general interest ground justifying a derogation from the PLQ. The Department of Territorial Planning, Housing and Energy (Département de l'aménagement, du logement et de l'énergie, DALE) applied the rules of the third zone by decision of 15 April 2014, then issued the permit on 25 April 2014, published in the FAO on 2 May 2014.

The condominium A. (the appellant), owner of neighbouring buildings, appealed on 28 May 2014 to the Administrative Court of First Instance (Tribunal administratif de première instance, TAPI), which dismissed the appeal on 20 March 2015. By judgment of 25 August 2015, the Administrative Chamber of the Geneva Court of Justice confirmed that decision, after correcting calculation errors. It held that the additional storey served a public interest in housing construction and constituted a minor derogation, the use being identical to that of the building and the maximum heights of the zone being respected.

Before the Federal Supreme Court, the appellant seeks annulment of the cantonal judgment and of the permit of 25 April 2014, as well as partial suspensive effect, granted by presidential order of 16 October 2015. She alleges arbitrary application of arts. 3 para. 4 and 12 para. 3 of the Geneva Act on development zones (loi générale sur les zones de développement, LGZD) and a violation of art. 21 SPA. The respondent seeks a declaration of inadmissibility or, in the alternative, dismissal. The DALE and the Court of Justice seek dismissal.

Considerations

As to admissibility, the public law appeal is open against a final decision given in last cantonal instance in the field of public construction law (arts. 90, 86 para. 1 let. d, 82 let. a FSCA). The appellant, co-owner of neighbouring buildings to the project, has a personal and legitimate interest and standing to act (art. 89 para. 1 FSCA). Her request for annulment of the permit is not an inadmissible cassatory request, since it must be understood as a request for refusal of the permit, the public law appeal being an appeal for reform (art. 107 para. 2 FSCA).

As to arbitrariness in the application of cantonal law, the Federal Supreme Court departs from the cantonal solution only if it is unsustainable, in manifest contradiction with the actual situation, adopted without objective grounds or in violation of a clear right, the reasoning required being demanding (art. 106 para. 2 FSCA). Under art. 3 para. 5 LGZD, the department may admit a deviation from the PLQ for a general interest ground or a technical adjustment. Under art. 12 para. 3 LGZD, raising a building to create additional housing constitutes such a ground for PLQs predating 24 November 2009. Cantonal case law nevertheless requires that the derogation remain minor and not empty the PLQ of its substance; the preparatory works indicate that a raising should not exceed one or two storeys.

The Court of Justice examined the general interest in housing construction, relying on the opinions of the State departments. It also took into account, as criteria for the significance of the derogation, the modification of a single storey, the integration of the building envelopes with the neighbouring buildings (14.84 m against 14.88 m and 14.75 m), compliance with the statutory envelopes (21…