Facts

The appellant, a public limited company engaged in construction, challenges the cantonal court's annulment of a prior building permit issued for an administrative building (building J) located within the perimeter of local development plan No. 27770-540 in the municipality of Vernier, canton of Geneva.

The PLQ, adopted by the Conseil d'Etat on 2 June 1986, provided for the successive construction of several buildings intended for service activities, together with a hotel, a shopping centre and an underground car park. It was located in development zone 3, near hydrocarbon storage tanks belonging to another company. Between 1995 and 2010 the appellant built three buildings: building DEF (owned by one of the respondents), building ABC (owned by a respondent company) and building GHI, which was the subject of several permits. Under an agreement of 2 July 2004 with the State of Geneva, part of the building rights of parcels No. 3600 and 4618 was transferred to the two parcels concerned by building GHI.

On 1 March 2011 the appellant lodged a preliminary application for building J, the final phase of the PLQ, comprising administrative premises, an activity zone, an underground car park, an SBB railway stop, a deck over the tracks and a hotel. The project was subsequently modified (removal of the hotel and the railway stop, modification of the car park access) and comprises eleven storeys above ground and upper ground floor. On 27 April 2012 the Department of Territorial Planning, Housing and Energy (DALE) granted the prior permit.

By judgment of 30 January 2014, the Administrative Court of First Instance upheld the appeals of the neighbouring respondents and annulled the permit. It found a remaining balance of 5,030 m² of gross floor area (SBP) across the two parcels, increased by a 10% Minergie bonus, i.e. 8,486 m² in total, whereas the planned building reached 10,552 m². It also noted that the commercial use, in place of the hotel use, and the siting differed from the PLQ, and that the project could only be carried out after amendment of the PLQ, taking into account the Ordinance on Major Accidents (MAO) and the safety distances from the hydrocarbon reserves.

By judgment of 16 December 2014, the Administrative Chamber of the Geneva Court of Justice dismissed the appellant's appeal. It held that the project was sufficiently precise to determine the SBP at the stage of the prior application. It defined the concept of SBP by reference to standard ORL 514 420, including «double skin» façades and premises used for residential or work purposes. It only took into account the building rights remaining after the transfers affecting the two parcels, namely 4,851 m² out of the initial 16,300 m², to which a 10% Minergie bonus was added, i.e. 5,336 m² in total. The planned building, of 10,552 m², exceeded this balance by nearly 100%, which did not amount to a minor modification. The cantonal court also indicated that a new project would have to comply with the MAO and the 100 m safety perimeter around the oil depots, which could require a revision of the PLQ.

The appellant lodges a public law appeal with the Federal Supreme Court and seeks annulment of the cantonal judgments and reinstatement of the permit of 27 April 2012. The respondents seek dismissal. The DALE seeks admission of the appeal, arguing that the question of the SBP did not have to be examined at the stage of the prior application. The Federal Office for the Environment notes that the cantonal judgment is not based on the federal Environmental Protection Act or on the MAO, the related consideration having only a subsidiary scope.

Considerations

The appeal is admissible as a public law appeal (art. 82 let. a, 86 para. 1 let. d and 90 FSCA). The appellant, whose permit was annulled, has a legally protected interest and standing to appeal (art. 89 para. 1 FSCA). The Federal Supreme Court recalls that the appeal cannot concern the violation of cantonal law as such (art. 95 FSCA), unless the application of cantonal law is arbitrary within the meaning of art. 9 Cst. Complaints of violation of fundamental rights and of cantonal law require an enhanced statement of reasons (art. 106 para. 2 FSCA), and appellate-type criticisms are inadmissible.

On the complaint of irregular composition, the appellant argues that the Administrative Chamber should have sat with five judges because of a question of principle (art. 30 para. 1 Cst. and art. 131 para. 2 let. a SPO/GE, formerly FJA/GE). The Federal Supreme Court finds that the concept of SBP is commonly applied by the Geneva authorities, that the reference to standard ORL 514 420 is a common practice, and that the cantonal court did not decide a wholly new question. It is therefore not arbitrary not to treat it as a question of principle. The DALE, which did not appeal, cannot raise new complaints, in particular by invoking art. 5 para. 1 LCI on the prior application, and this question is not examined. Moreover, verifying the SBP available at this stage is not arbitrary where the project is sufficiently precise, in particular where it constitutes the last stage of a PLQ.

On the definition of SBP, the Federal Supreme Court holds that standard ORL 514 420, which was not challenged, requires that the surfaces of walls and partitions be taken into account. The «double skin» façade, consisting of a simple façade and an outer glazed façade, must be considered as a whole, and the void separating them may be counted without arbitrariness. The atrium, which is an accessible and usable space giving access to the lettable parts, may also be included in the SBP. Finally, art. 127 para. 1 LCI, which prohibits residential use in basements, does not prevent other use, and the appellant has not shown that these basements could not be used in accordance…