Facts
Parties and procedural history: The appellants (18 residents, represented by attorney Prof. Dr. Andreas Abegg) live near the design plan area Torfeld Süd in Aarau. The City of Aarau, acting through the City Council, is represented by attorney Nik Brändli; the Cantonal Government of Aargau approved the amendment. The Cantonal Administrative Court of Aargau, 3rd Chamber, dismissed the appeal on 21 June 2021 (WBE.2020.247). The appellants applied to the Federal Supreme Court on 24 August 2021 and requested that the judgment be set aside and that approval of the partial amendment of the BNO 'Stadion 2017' be refused.
Background: In 2009 the special zone Torfeld Süd was created (§ 30ter old BNO), and the design plan followed on 23 August 2010. A building permit for a football stadium with a commercial shell use (shopping centre) and office and residential buildings was granted in 2014 and confirmed by the Federal Supreme Court in 2016 (1C_507/2015), but the project was not implemented for economic reasons. Under Plan B the stadium was to be lowered by 7-8 m and, instead, four high-rise buildings up to 75 m in height, predominantly for residential use, were to be erected.
Subject matter of the dispute: The comprehensive revision of the zoning plan 2018/2019 assigned the area to zone AW5 (noise sensitivity level III) and made it subject to the design plan requirement. The partial amendment BNO 'Stadion 2017' amends § 43 BNO (retail uses, net retail floor area of 10'000 m² in the eastern area, of which 8'000 m² for essential goods, conditional on the construction of the stadium) and Annex 2 BNO (planning objectives, high-rise buildings up to 75 m, maximum gross floor area of 80'500 m², residential use from the 1st upper floor, commercial share of at least 20 %). The proposal was approved in the popular vote on 24 November 2019.
Findings of the lower court: The Administrative Court held that a predominant residential use (commercial share approx. 37 %, residential share approx. 63 %) was in principle not in conformity with the structure plan, but considered the deviation from the cantonal structure plan to be factually justified and of minor significance (§ 30a para. 1 sentence 2 BauG/AG). It held that a prior amendment of the structure plan would be disproportionate, since approx. 62'000 m² of commercial space would remain, residential use generates less traffic, and the realisation of the stadium would be endangered without the revenue-generating area. With regard to noise protection, it held compliance with the immission limit values to be open but not unrealistic from the outset, since exceptional permits under Art. 31 para. 2 NAO could come into consideration.
Complaints of the appellants: (1) Impermissible deviation from the cantonal structure plan, since Art. 9 SPA binds the authorities and an amendment by the Grand Council is necessary (violation of the separation of powers); (2) violation of Art. 24 EPA, since the upzoning creates a new building zone or at least a new development; (3) violation of Art. 22 and 25 EPA, since the immission limit values for railway and sports noise cannot be complied with and the project depends on area-wide exceptional permits; (4) arbitrary assumption that the noise situation will improve.
Statements: The City Council requested dismissal. The Administrative Court and the Cantonal Government waived submission of comments. The Federal Office for the Environment (BAFU) commented on the noise-law assessment without making a request.
Considerations
Admissibility and scope of review: The appeal in public law matters against the final cantonal decision of the last instance is in principle admissible under Art. 82 lit. a, 86 para. 1 lit. d and 90 FSCA. The appellants, as neighbours, are particularly affected and therefore have standing under Art. 89 para. 1 FSCA. The Federal Supreme Court examines federal law ex officio (Art. 106 para. 1 FSCA), and examines violations of fundamental rights and arbitrary application of cantonal law only if such a complaint is adequately substantiated (Art. 106 para. 2 FSCA). New facts are admissible only to a limited extent (Art. 99 para. 1 FSCA).
Deviation from the cantonal structure plan: According to case law (BGE 119 Ia 362 E. 4a; BGE 137 II 254 E. 3.3), deviations from the structure plan are permissible if they are factually justified and of minor significance and a prior formal amendment of the structure plan would be unreasonable; a strict binding effect does not apply if an overall better solution stands in the way. A formal adjustment is, however, indispensable for projects with significant effects on spatial order. The Federal Supreme Court confirms the assessment of the lower courts that the deviation is of minor significance: the amendment concerns only a sub-area of the ESP sub-site Torfeld Süd-West, the eastern part is designated in the structure plan as a stadium site, and shopping centres and traffic-intensive sports uses belong to category PN and not to the priority uses PVN/APN. Residential uses are even to be promoted in ESP near the town centre according to the structure plan.
Factual justification: The cross-financing of the stadium, which is in the public interest, under changed economic conditions justifies the amendment. The lack of an independent study on demand for commercial space does not alter this, since the approved but unrealised project with commercial use supports the accuracy of the City Council's presentation, and the owner/investor can contribute its assessment of financeability. A close planning connection between stadium and residential use exists, since the maximum gross floor area may only be realised on condition that the stadium is built beforehand or at the same time; coordination at different locations would be practically hardly feasible.
Urgency: The appellants rely on the granting of a licence and the adjustment of the licensing regulations of the Swiss Football League. The Federal Supreme Court holds, however, that the exceptional permit can only be extended by one year at a time and thus does not constitute a lasting solution. Since a stadium in Torfeld Süd has been planned for years and several popular votes have taken place, it is legitimate not to further delay the planning by an adjustment of the structure plan.
No structure plan requirement for residential use: According to Art. 8 para. 2 SPA, projects with significant effects on space and the environment require a basis in the structure plan; concentrations of residential use in principle do not fall under this. Art. 8a SPA and the residential focal points (S 1.9 structure plan) do not require a designation for Aarau as a core city, since sites for predominantly residential use are also permissible outside the designated WSP. The minimum size of 400 to 1'000 inhabitants is a minimum requirement and not a structure plan reservation. The special-use planning must, however, take into account the requirements for residential quality and open spaces; should adequate residential quality not be achievable otherwise, the full use of the permissible density must be foregone.
Noise protection, rezoning and development (Art. 24 EPA): Under Art. 24 para. 1 EPA, new building zones for noise-sensitive uses may only be designated in areas where the planning values are or can be complied with; rezoning does not count as the designation of new building zones (sentence 2). Art. 24 para. 2 EPA and Art. 30 NAO concern development bans for building zones not yet developed. The contested amendment is a rezoning, even though the industrial buildings in the eastern part were demolished. The area is served by water, energy and waste water infrastructure as well as by roads; the residential use is rather relieving for the infrastructure. According to case law (judgments 1C_695/2017 E. 7.3, 1C_182/2019 E. 3.3), Art. 24 para. 2 EPA does not apply where an adequately developed building zone is rezoned; the legislator intended to enable rezoning and densification in city centres. Art. 24 EPA therefore does not stand in the way of the amendment.
Protection against immissions (Art. 22 and 25 EPA): Building permits for noise-sensitive buildings presuppose compliance with the immission limit values or an appropriate arrangement of rooms and soundproofing measures (Art. 22 EPA, Art. 31 NAO); exceptions under Art. 31 para. 2 NAO are possible where there is an overriding interest and the cantonal authority consents. For new stationary installations, Art. 25 EPA applies. For sports noise, which has no exposure limit values, the enforcement authority assesses the individual case under Art. 15, 19 and 23 EPA (Art. 40 para. 3 NAO), based on the BAFU enforcement aid on sports noise. At the level of zoning planning it must be established that a suitable solution can be found within the later planning (feasibility proof; BGE 147 II 484 E. 4.3.1). The planning report and the EIA report on the design plan show that the immission limit values for railway noise are exceeded at night at individual facades and that the…