Facts

The respondents, a married couple, have operated the Rosenau winery in Kastanienbaum (municipality of Horw) since 1981. The property lies within the perimeter of BLN object No. 1606 'Lake Lucerne with Kernwald, Bürgenstock and Rigi'. The operating units are spread across several plots.

A first building application dated 17 November 2008 for an operations building with residential use on agricultural parcel No. 81 failed after the Federal Commission for Nature and Cultural Heritage (ENHK) found a serious impairment of the BLN object. A revised project dated 4 June 2010, which provided for the clearing of a hedge, was likewise rejected. A second, downsized project shifted uphill (application dated 2 June 2011) received a building permit, which the Lucerne Cantonal Administrative Court annulled on 7 November 2012. The Federal Supreme Court dismissed the builders' appeal on 3 September 2014 because the structure was oversized; the planned residential use, by contrast, it considered compliant with the zoning (judgment 1C_647/2012).

On 10 June 2015 the builders filed a new building application, against which several neighbours lodged objections. On 6 May 2016 the Department of Spatial Development and Economy (rawi) affirmed conformity with the zoning and granted the permit for the expansion of the Bergstrasse. On 30 June 2016 the Horw Municipal Council granted the building permit and dismissed the objections. The Lucerne Cantonal Court, 4th Division, dismissed the objectors' appeals on 5 July 2017.

Against this decision, the objectors [A.] (1C_457/2017) as well as [B.] and co-parties (1C_463/2017), and the Federal Office for Spatial Development ARE (1C_471/2017) filed public law appeals with the Federal Supreme Court. They requested that the decision and the permits be set aside and the building application be rejected, or alternatively that the matter be remanded. The respondents requested dismissal. The cantonal court and the municipality largely waived submissions. By order of 19 October 2017, suspensive effect was granted to the appeals in proceedings 1C_463/2017 and 1C_471/2017.

The central issues are: the complaints of violation of the right to be heard in connection with the Agridea expert report, the zoning conformity of residential space for the outgoing generation, the operational necessity and dimensioning of the operating premises (pressing house, barrique cellar, sales and tasting room, open work area), the attribution of leased buildings, and access via the Berg- and Seestrasse.

Considerations

The appeals are admissible: the ARE has standing under Art. 89 para. 2 let. a FSCA in conjunction with Art. 48 para. 4 SPO. The neighbours are entitled to appeal due to the distance and the traffic and emission impacts (BGE 140 II 214). The proceedings are joined. The complaints of violation of the right to be heard regarding participation in the selection of the expert and the supplementary questions are unfounded or, in any event, cured, as there is no indication that the expert was dependent and the cantonal court explained the relevance of the supplementary questions.

Housing for the outgoing generation is conforming to the zone in the agricultural zone if the requirements of the retirement-housing rules are met (BGE 116 Ib 228). This is the case here: the farm manager reaches age 65 in 2020, the handover is foreseeable, and he lived for 31 years at the Rosenau estate. Living on the not-yet-existing farm is not required. The uncertainty of succession is not decisive, since a successor can be found for the successful operation. The residential floor area is not oversized.

A new building is only operationally necessary if the use cannot be realised in existing structures (BGE 129 II 413). Existing leased agricultural buildings must be taken into account, but not buildings that do not belong to the agricultural business or are not available to the respondents. The Spissen barn (220 m2), which is used for the operation, must therefore be considered. A renewed site evaluation was not required, since it took place in earlier proceedings. Future needs are only admissible if they are established with some certainty and demonstrated by an operating concept; a cautiously sized operating reserve is possible in a BLN area, but landscape protection requires a strict limitation to what is operationally necessary.

The Agridea expert report, after clarification of a contradiction through the supplementary report, is conclusive; it is based on current production (650 g of grapes/m2) and a cask capacity of around 100,000 l. The 25% operating reserve played no decisive role for the space requirement. The complaints against the report are unfounded. The barrique cellar in the basement is admittedly generously dimensioned, but the operating area as a whole was considerably reduced, so the underground operating space is not regarded as oversized. The sales and tasting room…