Facts
The Zweckverband Abwasserregion Laufental-Lüsseltal (ARAL), as respondent, submitted on 20 March 2014 to the Building Inspectorate of the Canton of Basel-Landschaft a building application for the construction of a combined sewer overflow basin on parcel No. 2642 (formerly No. 528) in the land register of Zwingen, which lies in the agricultural zone. The facility is intended to collect rainwater from the municipalities of Laufen and Dittingen before it flows, after treatment, into the Birs. After the Building Inspectorate had assessed a first site as not approvable due to objections from the Air Hygiene Office of the two Basel cantons, the ARAL submitted a new project on 12 June 2014. The appellants, direct neighbours of the construction plot, lodged objections.
The Department of Construction and Environmental Protection (BUD) granted the exceptional permit on 19 January 2015 and dismissed the objections. The Regierungsrat dismissed the appeal lodged against this decision but imposed the court costs of CHF 600.-- on the appellants. The Kantonsgericht Basel-Landschaft partially upheld the appeal by judgment of 28 September 2016, annulled the allocation of costs and remitted the matter to the Regierungsrat for reallocation.
The appellants lodged a public law appeal with the Federal Supreme Court on 26 January 2017. They requested that no exceptional permit be granted, or in the alternative that the matter be remitted to the BUD for reassessment, based on an independent expert opinion on site dependence and alternative sites, as well as a reallocation of costs and a party compensation award. The ARAL and the BUD requested dismissal. The Kantonsgericht waived a response. The Federal Office for Spatial Development (ARE) had certain doubts about the site but did not consider it manifestly unsuitable. The Federal Office for the Environment (BAFU) considered the cantonal court's application of environmental protection and water protection law to be correct. The President of the I. Public Law Division rejected the application for suspensive effect by order of 1 March 2017.
The disputed issues are the conformity with the zoning plan, or the admissibility of an exceptional permit under Art. 24 SPA, in particular relative site dependence (lit. a) and the absence of overriding interests (lit. b), as well as formal objections concerning the remedying of a breach of the duty to give reasons.
Considerations
The Federal Supreme Court admitted the appeal as a public law appeal against a final cantonal decision (Art. 82 lit. a, Art. 86 para. 1 lit. d, Art. 90 FSCA). It regarded the cantonal court's remittal decision on the reallocation of costs as a final decision, since the main issue concerning the exceptional permit had been conclusively decided and the question of costs is of subordinate importance. The appellants, as direct neighbours, have standing to appeal (Art. 89 para. 1 FSCA). Complaints concerning the facts which do not substantiate a manifest inaccuracy (Art. 97 para. 1 FSCA) were not heard; the question of site dependence and overriding interests is a question of law.
As regards the violation of the right to be heard, the Federal Supreme Court held that a breach of the duty to give reasons is generally not particularly serious. The BUD had carried out a balancing of interests, although an insufficient one, and remedied it in the proceedings before the Regierungsrat with a response dated 22 May 2015. The appellants were able to express themselves comprehensively in the exchange of written submissions, at the site inspection and before the Kantonsgericht, so that the remedying in the appeal proceedings with full powers of review was admissible. The cantonal court's reasoning as to why it refrained from remittal also met the requirements; the court is not obliged to address every party submission in detail.
On the merits, it is undisputed that the project does not conform to the zoning plan in the agricultural zone and that an ordinary permit under Art. 22 SPA is excluded. For an exceptional permit under Art. 24 lit. a SPA, relative site dependence is sufficient where weighty reasons make a site outside the building zone appear considerably more advantageous than sites within the building zone. Objective standards must be applied and a comprehensive balancing of interests must be carried out, which overlaps with Art. 24 lit. b SPA. The cantonal court seriously examined the alternative sites (Dittingerrank, Werkhof, variants with two basins); the Dittingerrank is excluded due to encroachment on the shoreline protection zone, the parcel of the Dittingen land due to the lack of an acquisition possibility, and the Werkhof due to contamination as a site of contaminated land, public use and inadequate development. The two-basin variant causes additional costs and requires a larger area, which contradicts the principle of economical land use (Art. 1 para. 1 SPA). The chosen site can be used jointly, is well developed, largely underground and adjoins a residential and commercial zone; the consumption of agricultural land is comparable for all alternatives. A supplementary expert opinion was not shown to be necessary, and [C. AG] was not biased in the sense of a court expert as the project author, since the applicant must provide the basis for the examination of alternatives.
With regard to overriding…