Facts

The appellant [A.] , a neighbour and owner of a residential house, challenges the building permit for the new construction of a three-row cubicle barn for 122 animals with a slurry pit, a photovoltaic system and silos, as well as the conversion of a barn. The respondent [B.] operates an agricultural holding in Buchs, which was converted from dairy farming to meat production.

The Building Directorate of the Canton of Zurich granted the spatial planning permit, and the Building Authority of the Municipality of Buchs granted the building permit. The Building Appeals Court dismissed the appeal. On 4 September 2014 the Administrative Court upheld the appeal for lack of investigation of the site and remitted the matter; the Federal Supreme Court did not enter into the appeal against this (1C_531/2014). After further investigations into alternative sites, the Building Appeals Court dismissed the appeal on 19 August 2015. On 11 February 2016 the Administrative Court upheld the appeal only with regard to the court costs, but dismissed it on the merits.

By public law appeal dated 18 April 2016, the appellant requests the annulment of the lower court decisions and the permits and the remittal with instructions to approve the barn building only at alternative sites. He further requests findings on the suitability of the alternative sites and complains about the amount of the party compensation awarded by the lower court. The lower court, the Building Directorate and the respondent request dismissal; the FOEN sees no substantiated violation of federal environmental law; the ARE points to spatial planning considerations (tiered construction, fruit-growing areas).

In dispute are in particular the sites a1, a2, b1, b3 and the variants b1-Süd and b3-Süd. Variant a1 endangers an inventoried former mine. b1 and b3 have better soil quality (NEK 5-7 instead of NEK 2 at the project site is worse for alternatives, soil quality at the project site NEK 2 is better), but are difficult to access due to gradients of 17.5 to 19%; a2 has slopes of 31% and 43% and would entail greater soil consumption.

Considerations

The public law appeal under Art. 82 lit. a FSCA is the correct remedy; the appellant, as a neighbour, has standing to appeal (Art. 89 para. 1 FSCA). The interlocutory decision of 4 September 2014 is contestable within the scope of Art. 93 para. 3 FSCA. Challenging the lower court decisions that were replaced by the judgment is inadmissible (devolutive effect). Requests for findings on the suitability of the alternative sites are not addressed, as there is no interest beyond the upholding of the appeal (Art. 1.3). Conducting an on-site inspection is dispensed with, as the facts sufficiently appear from the file.

When choosing a site for buildings in the agricultural zone, the builder must prove under Art. 34 para. 4 lit. b SPO that the building is objectively necessary at the intended site and that no other, better suited site comes into consideration. The balancing of interests is guided by Art. 1 and 3 SPA, in particular rational land use, development, townscape, fruit-growing areas and nature and landscape protection. The choice between sites is a question of law subject to free review, but the Federal Supreme Court exercises restraint regarding local conditions and expert reports; it only examines whether an overall balancing of interests consistent with federal law took place.

According to case law, the interest in avoiding urban sprawl requires that farm buildings be built as close as possible to the operational centre. The variants b1-Süd and b3-Süd lack any connection to settlement and were therefore rightly not considered.

Regarding sites b1 and b3, the Administrative Court assessed access via the Heidelackerweg with a gradient of 17.5 to 19% as hardly possible and associated with major operational disadvantages. The complaint of a violation of the duty to give reasons (Art. 29 para. 2 Cst.) and of manifestly incorrect establishment of facts (Art. 97 para. 1 FSCA) fails: a tiered construction method does not come into consideration for a project of this size according to the cantonal Office for Landscape and Nature, and the cantonal Settlement Commission as well as the Building Appeals Court assessed the access as difficult following an on-site inspection. Good quality access is an important criterion in the balancing of interests. The better soil quality (NEK 2 at the project site compared with NEK 5-7 at b1 and b3) and the slightly better integration of the alternative sites indeed speak in their favour, but after weighing they are not decisive; the Administrative Court did not exceed its margin of discretion. The reference by the ARE to maintaining sufficient fruit-growing areas does not lead to a different result, as the cantonal office confirms that the cantonal share of the minimum extent is fulfilled.

Regarding site a2, the cantonal Settlement Commission found a gradient of 31% and 43%, that no alternative access exists because of the former mine, and that…