Facts
The respondent, [B. AG] (the developer), is the owner of parcel No. 66 in the land register of Warth-Weiningen, which is located in the gravel pit area 'Närgeten' and is predominantly zoned as extraction zone 'Ab'. The neighbouring parcel No. 65 to the north belongs to the appellant (neighbour). Both parcels are subject to a development plan for the recultivation of the gravel extraction zone. The gravel pit lies within the Au water protection zone.
The developer operates a construction waste processing plant (recycling plant) in the gravel pit, for which the Thurgau Office for the Environment (AfU) had granted a construction and operating permit in 1995. In 2005 an extension with mobile equipment was approved, with a processing volume of at most 26'000 m3 (approx. 39'000 t) per year; the operating permit was extended in 2010 until 31 October 2015.
On 6 December 2013 the developer applied for a building permit for an extension of the recycling plant: the paved operating area was to be enlarged from 7'000 m2 to 12'200 m2, the plant was to be newly erected approximately 100 m further away, and the infiltration facility was to be newly constructed. On 8 September 2014 the AfU granted the construction and operating permit until 30 September 2019 and limited the annual throughput to 26'000 m3 (approx. 40'000 t). On 9 September 2014 the Thurgau Office for Spatial Development (ARE/TG) granted an exceptional permit under Art. 24 SPA. The municipality of Warth-Weiningen dismissed the neighbour's objection and granted the building permit on 25 September 2014.
The neighbour's appeal (Rekurs) was dismissed by the Department of Construction and Environment (DBU) on 22 September 2015, and the appeal to the Thurgau Administrative Court was likewise dismissed on 24 August 2016. The neighbour then lodged an appeal in public law matters with the Federal Supreme Court, requesting that the decision be set aside and that the building permit be refused or annulled. The application for suspensive effect was dismissed. The Administrative Court, the municipality and the AfU requested dismissal; the Federal Office for Spatial Development (ARE) requested that the appeal be upheld; the Federal Office for the Environment (FOEN) considered the project unobjectionable from the standpoint of environmental and water protection law.
The central questions in dispute were: the admissibility of an exceptional permit under Art. 24 SPA instead of land-use planning (planning obligation); the relative location-dependence; the assurance of compliant waste management (prohibition on mixing); water protection under the FOEN construction waste guideline; and the petrol station on the site.
Considerations
The appeal is in principle admissible (Art. 82 ff., Art. 89 para. 1 FSCA). A violation of federal law may be raised; the application of cantonal law is reviewed only for arbitrariness (Art. 9 Cst.). Complaints concerning fundamental rights and complaints concerning the facts are subject to qualified requirements of substantiation (Art. 106 para. 2, Art. 97 FSCA). The complaint of unequal treatment was not examined for lack of sufficient substantiation.
The Federal Supreme Court holds that a project that does not conform to the zone and that has significant effects on the land-use order may be approved only after land-use planning and not under Art. 24 SPA (planning obligation, Art. 2 SPA). The obligation to carry out an environmental impact assessment is in this respect an indication of the planning obligation. In borderline cases the cantonal authorities have a margin of discretion. When an existing, lawfully approved installation is extended, only the additional effects are decisive. The enlargement by approximately 74 % and the doubling of the volume were taken into account, as was the minor additional traffic of 2-3 % (below the 10 % threshold of perceptibility), the low-lying position of the plant in the gravel pit, its visibility only from the immediate vicinity, and the limitation of the permit until recultivation. There is therefore a borderline case, and the lower court did not violate federal law by permitting an exceptional permit under Art. 24 SPA. The cantonal structure plan expressly allows necessary recycling plants in material extraction zones.
The complaint regarding the violation of the municipal building regulations (Art. 4.4.6 para. 4) is immaterial, since the application of municipal law is not reviewed as such and no complaint of arbitrariness was raised. The Federal Supreme Court does, however, examine ex officio the compliance of the exceptional permit with federal law.
As regards location-dependence under Art. 24 lit. a SPA, relative location-dependence, which requires a comprehensive weighing of interests, is sufficient. The lower court was entitled to find that the site in the extraction zone is considerably more advantageous than industrial zones: the emissions have a less burdensome effect in the gravel pit, synergies in gravel and construction waste processing reduce transport routes, and water protection is ensured by…