Facts
The Building Permits Section of the Jura Territorial Development Service (SPC) issued on 10 June 2014 to the respondent (the builder, an agricultural operator) a permit to build a fattening hall with winter garden for 19'800 chickens, including roof ventilation, silos, a slurry pit and a buried gas tank, on parcel no. 2242 of the municipality of Bonfol, located in an agricultural zone. The planned building measures 75.20 m x 23.40 m x 3.70 m, and the project provides for planting a hedgerow, 32 fruit trees and three copses. The SPC dismissed the objections, including that of Pro Natura Jura.
Ruling on appeal by Pro Natura Jura and Pro Natura (the appellant), the first-instance administrative judge of the canton of Jura annulled the decision on 16 June 2015. Seised in turn, the Administrative Court of the Jura Cantonal Court annulled that decision and granted the authorisation by judgment of 7 April 2016.
Pro Natura lodges an appeal in public law matters against this judgment and requests its annulment, so that no authorisation is granted. The cantonal court, the SPC and the builder request dismissal of the appeal. The Federal Office for Spatial Development (ARE) and the Federal Office for Agriculture (OFAG) defer to the court's judgment, the ARE considering that the project should be subject to special planning and that the reasoning on internal development and long-term viability is deficient, and the OFAG stressing the importance of protecting arable land (SDA). The President of the First Public Law Division granted suspensive effect to the appeal on 31 May 2016.
Main issues: the right to be heard (refusal to add to the file documents produced after the close of the investigation), the necessity of special planning (art. 16a para. 3 SPA), conformity with the zone's purpose for agricultural zones (internal development, art. 36 SPO), the necessity of the construction and the choice of location, the weighing of interests (landscape, SDA), and the long-term viability of the operation.
Considerations
On admissibility, the appeal in public law matters is admissible (art. 82 let. a, 86 para. 1 let. d and 90 FSCA). Pro Natura, an organisation entitled under art. 55 EPA and art. 12 NCHA (DORAO), has in principle standing under art. 12 NCHA, art. 16a SPA prescribing a federal task.
On the right to be heard (art. 29 para. 2 Cst.), the cantonal court could, by a non-arbitrary anticipatory assessment of the evidence, disregard documents produced after the close of the investigation (an expert note prepared by an opponent, newspaper articles and photographs unconnected with the operation in dispute), since they clearly had no genuine probative value. The complaint is dismissed. On the merits, the construction conforms to the agricultural zone if it serves the internal development of the operation (art. 16a para. 2 SPA, art. 34 para. 1 and 36 para. 1 SPO). The dry matter criterion (art. 36 para. 1 let. b SPO, potential covering at least 70% of the needs of livestock, here 92.5 or even 100%) may be applied without a management concept, judgment 1C_120/2012 not imposing such a rule; there is no hierarchy between letters a and b of art. 36 SPO. The livestock farming remains ancillary and the operation remains dependent on the land, despite a substantial herd of 100 LSU on more than 100 ha of UAA. Special planning (art. 16a para. 3 SPA) was therefore not necessary.
On planning, the ARE invokes the scale of the project, but federal law does not require special planning for a project conforming to the zone's purpose, even of large scale, since the community has already weighed the interests when adopting the zoning plan. The criteria cannot be stricter than for non-conforming constructions. The project is not subject to an environmental impact assessment, the traffic (7.5 rotations per year) is not excessive and access is not genuinely problematic. Nothing requires planning.
On necessity and location (art. 16a para. 1 SPA, art. 34 para. 4 let. a and b SPO), the existing buildings are used, the former pig-pen premises being too small. The other sites are excluded for reasons of minimum distances, proximity to a fen or a river, or lack of truck access, and the chosen location avoids a polluted site. Federal law does not require the examination of alternatives, but the objective necessity of the location must be established and the principle of concentration respected. Parcels in industrial zones are excluded because the builder has no suitable ones. Neighbouring agricultural parcels, despite a lack of surmountable…