Facts

The respondent, Salt Mobile SA (formerly Orange Communications SA), on 31 July 2014 applied to the Municipality of Walterswil for a building permit to replace the existing transmitter installation on parcel No. 358, located in the agricultural zone. The appellant lodged an objection. The Regierungsstatthalteramt Oberaargau granted the permit by overall decision of 12 December 2014 and dismissed the objection.

The appellant's appeal was dismissed on 22 April 2015 by the Bau-, Verkehrs- und Energiedirektion of the Canton of Bern (ACI). The Administrative Court of the Canton of Bern dismissed the appeal by judgment of 1 December 2015, insofar as it was admissible.

By appeal of 10 January 2016, the appellant asked the Federal Supreme Court to refuse the building permit or, alternatively, to remit the matter. The ACI and the Administrative Court requested dismissal, as did the respondent. The ARE took the view that the Administrative Court had not infringed federal law.

The installation was approved in 2001 and extended with UMTS in 2004. Additional antennas of Swisscom, Sunrise and the Canton of Bern police are located on the mast. The respondent intends to replace two antenna panels with two new ones with the same transmission directions, to increase the transmission power from 4,320 W to 14,400 W and to additionally offer LTE. The appearance remains unchanged.

The appellant argued that the power had probably been increased in 2009 without a permit, and in the cantonal proceedings requested dismantling to the 2001 state. The Administrative Court did not entertain this request, as it was late and outside the subject matter of the proceedings.

Considerations

The contested decision is a cantonal decision of last instance concerning a building permit for a mobile telephone installation and is subject to the public law appeal (Art. 82 ff. FSCA). The appellant lives within the perimeter in which radiation reaches 10% of the installation limit value and is therefore entitled to appeal (Art. 89 para. 1 lit. b and c FSCA). The appeal is admissible.

The complaint that the Administrative Court failed to address the request for dismantling is unfounded. The lower court was entitled not to entertain the request as late and extraneous to the proceedings. There is no breach of the duty to give reasons under Art. 29 para. 2 Cst., since the question of the 2009 permit was not decisive according to the Administrative Court and the appellant has not refuted this.

The appellant complains that the permit was granted solely for financial reasons and refers to judgment 1C_200/2012. The Administrative Court correctly did not rely on Art. 24c SPA, since conversion to a new mobile telephone standard constitutes a material change to the existing installation (cf. BGE 133 II 400 consid. 3). Art. 24 SPA is therefore decisive.

An exceptional permit under Art. 24 SPA requires that the purpose necessitates a location outside the building zones (lit. a) and that no overriding interests oppose it (lit. b). For mobile telephone installations, relative site-dependence suffices according to practice if weighty reasons make a location outside the building zone appear considerably more advantageous than locations within the building zone (BGE 141 II 245 consid. 7.6). The installation causes no significant diversion of non-building land and does not appear obtrusive, since existing structures are used and the antennas are integrated…