Facts

The Political Municipality of Mosnang (appellant, represented by its municipal council and a lawyer) intended to provide the road between the hamlets of Lenzlingen and Wolgensingen with a hard surface in order to improve access to Wolgensingen. The route was designated as a hiking trail without a hard surface and as a cycle path, and was to be removed from the hiking trail network. Planned was a rerouting of the hiking trail via a larger arc on a municipal road of 3rd class and a municipal path of 3rd class to the east, through the Färachwald and the Letten area, up to an existing hiking trail near Wolgensingen. In addition, a short section of the municipal path was to be slightly relocated.

On 13 August 2013 the municipal council adopted the construction project and the partial road plan and submitted it to the Department of Construction of the Canton of St. Gallen for approval. The cantonal Office for Nature, Hunting and Fisheries (ANJF) requested, in the consultation procedure, that the new hiking trail not be approved: in the central section there was in fact no path, and a previously quiet area with important wildlife habitat would be opened up. By decision of 13 June 2014 the Department of Construction refused approval. The municipality appealed to the Administrative Court of the Canton of St. Gallen, which on 22 January 2016 dismissed the appeal insofar as it was admissible.

By public law appeal of 29 February 2016, the Municipality of Mosnang requested the annulment of the decision of the Administrative Court. The Administrative Court and the Department of Construction requested dismissal.

The subject matter of the dispute is therefore the road expansion (hard surface) and the rerouting of the hiking trail, in particular the replacement obligation under Art. 7 FHTA and the balancing of interests under Art. 9 FHTA.

Considerations

Admissibility: The appeal is directed against a final cantonal decision in a public law matter (Art. 82 let. a and Art. 86 para. 1 let. d FSCA). The municipality is entitled to appeal under Art. 89 para. 2 let. d FSCA in conjunction with Art. 14 para. 1 let. a FHTA. The appeal is admissible.

Replacement obligation and connecting pieces: The municipality argued that the road is to be classified as a connecting piece under Art. 3 para. 2 FHTA, as it is open to general vehicular traffic, so that no replacement obligation exists under Art. 7 FHTA. The Federal Supreme Court rejects this. The replacement obligation under Art. 7 para. 1 FHTA relates to the entire hiking trail network; the term 'hiking trail' in para. 2 designates a part of this network. This follows from the wording, general usage, the Message and the FSTA implementation aids. A distinction between actual hiking trails and connecting pieces finds no support in the law and contradicts the purpose of the law, which is to prevent a deterioration of the existing situation. Moreover, the route in question is expressly designated as a hiking trail on the plan, and its function as a hiking trail is not excluded by its accessibility to vehicular traffic.

Hard surface as trigger of the replacement obligation: Under Art. 6 FHTO a hard surface is considered an unsuitable hiking trail surface. Applying a hard surface to the existing hiking trail therefore in principle triggers a replacement obligation under Art. 7 para. 2 let. d FHTA.

Balancing of interests under Art. 9 FHTA: Where a replacement obligation in principle exists and replacement conflicts with other concerns under Art. 9 FHTA (nature and heritage protection, agriculture, national defence), a comprehensive balancing of interests must be carried out. The lower court considered the interest in road expansion to be minor: access to the five properties is adequate in its current state, dust generation can be reduced by driving slowly, and maintenance is reasonable. The appellant did not dispute…