Facts

The respondent ([A.] , owner of a broiler and dairy farm with 28 ha of utilised agricultural area in Wuppenau, village section [U.] ) plans to increase the number of broiler chickens from around 5'900 to over 15'000. To this end, a 62.32 m long and 24 m wide poultry fattening barn with three approx. 8 m high silos is to be built on plot No. xxx. The western part lies in the agricultural zone, the eastern part in the landscape protection zone under Art. 13 of the Building Regulations of the Municipality of Wuppenau (BauR). In addition, the conversion of existing barns, a new loose-housing barn, a manure area and a slurry pit are planned.

The plot lies in the area with priority for landscape and networking function under the cantonal structure plan. The building application of 18 December 2012 was endorsed by the Swiss Foundation WWF (Bodensee/Thurgau section). The forestry office approved a reduction of the forest distance to 10 m, the agricultural office considered the project 'tolerable', and the Office for Spatial Development (ARE/TG) considered it compliant with the zoning. The Municipality of Wuppenau granted the building permit on 26 September 2013 and dismissed the objection.

The Department for Construction and Environment (DBU) dismissed the appeal on 17 December 2014; the Administrative Court of the Canton of Thurgau dismissed the complaint on 29 April 2015. The Swiss Foundation WWF lodged a public law appeal with the Federal Supreme Court on 17 August 2015 and requested the annulment of the administrative court's decision. The Federal Office for Spatial Development requested an examination of the necessity of the buildings and a comprehensive balancing of interests regarding the choice of location; the Federal Office for the Environment considered the forest distance exception comprehensible but the project incompatible with the municipal landscape protection zone.

The subject matter of the dispute is the granting of the permit for the poultry fattening barn based on Art. 16a para. 2 SPA in conjunction with Art. 34 paras. 1 and 4 SPO, and the question whether old or new cantonal planning and building law applies (transitional provision § 121 PTA/TG).

Considerations

Admissibility: This is a final cantonal decision in a public law matter (Art. 82 lit. a, Art. 86 para. 1 lit. d FSCA). The Foundation is entitled to appeal as a nationwide environmental organisation under DORAO and Art. 12 para. 1 lit. b NCHA, since a federal task (Art. 24 SPA, Art. 2 NCHA) is affected. The merely cassatory request is sufficient, as the reasoning shows the aim of refusing the building permit (Art. 107 para. 2 FSCA).

Prohibition of novelties: New submissions (economic viability at a 30 m hall length, belated rejoinder, new documents on the resizing of the landscape protection zone) are inadmissible before the Federal Supreme Court (Art. 99 para. 1, Art. 42 para. 2, Art. 105 para. 1 FSCA).

Procedural complaint (arbitrariness, § 18 VRG/TG): The composition of the authority was apparent from the municipality's publicly accessible homepage; the right to a correctly constituted authority is part of Art. 29 para. 2 Cst. The decision bears the signatures of the mayor and municipal clerk, whereby § 18 para. 1 no. 8 VRG/TG is satisfied. The complaint is unfounded.

Intertemporal law: The lower court applied the general principles of intertemporal law but overlooked that these apply only subsidiarily where no transitional provision exists. § 121 PTA/TG governs the assessment of pending building applications under the old law, whereby pendency is determined by the date of submission. The principle of legality (Art. 5 para. 1 Cst.) requires the application of this transitional provision. Accordingly, § 13 PIO/TG is not applicable and the question of municipal autonomy need not be examined. The structure plan is binding only on authorities and not parcel-specific; a pre-effect of the structure plan on the zoning plan is impermissible.

Zoning compliance: Under Art. 13 BauR, only buildings serving the maintenance or cultivation of the area are permitted in the landscape protection zone. The poultry fattening barn serves soil-independent production and is therefore not zoning-compliant in the landscape protection part. No exception under Art. 13 BauR was requested or granted. The municipal regulation is stricter than Art. 24 SPA and is in principle permissible, so an exception under Art. 24 SPA need not be examined. The project therefore cannot be approved as a whole.

New law (examination for procedural economy): Under § 13 PIO/TG, agricultural buildings in the landscape protection zone are permitted provided the zone's purpose is not impaired. The lower court examined this only in general terms, and its finding that the requirements of landscape protection were met is untenable. The comparison with a pig barn of [B. AG] is immaterial, as that barn lies in the agricultural zone. The size and appearance of the project impair the landscape of [U.] .

Balancing of interests under Art. 34 para. 4 lit. b SPO: The respondent's economic interest in expanding the poultry fattening is comprehensible. The hall lies entirely within the area with priority for landscape (structure plan no. 2.3); ARE/TG assessed the project only as 'tolerable' and exposed; the hall impairs the protection objectives of the area '[V.] ' and its…