Facts
As part of the 4th supplementary phase of the Zurich S-Bahn network, the SBB plan a new fast S20 line from Zurich to Stäfa, with stops in Küsnacht, Meilen and Männedorf. To allow the S20 to pass through, the S16 trains that turn at Herrliberg-Feldmeilen station are to be parked on a new turnaround track on the hillside side.
On 3 June 2013 the Federal Office of Transport (BAV) approved the project (costs approx. CHF 35 million, forward-compatible with the later double-tracking towards Meilen) and dismissed, subject to conditions, the objections of the Interessengemeinschaft A., of B.C. and C.C., and of [D.], insofar as they were admissible. On 12 February 2015 the Federal Administrative Court, Division I, dismissed the appeals insofar as they were admissible.
The Interessengemeinschaft (proceeding 1C_162/2015) and the spouses B.C./C.C. and D. (proceeding 1C_164/2015) filed appeals against this judgment with the Federal Supreme Court under public law. They requested that the lower court's judgment be set aside; the second-named appellants' conditional requests were for remittal and, in the alternative, for supplementing the plan approval with conditions. The SBB and the BAV requested dismissal. Suspensive effect was granted on 4 September 2015.
The subject matter of the dispute comprises the plan approval under railway law for the turnaround track, the obligation to carry out an environmental impact assessment (EIA), noise protection (driving noise and stationary noise), the precautionary principle and the examination of alternatives, the equal distribution of burdens regarding overhead line masts, the temporary use of a plot, and the regulation of costs and compensation.
- The proceedings were joined because the appeals concern the same decision.
- The request for an on-site inspection was dismissed, as the local conditions are sufficiently clear from plans, inspection records and the file.
- The request to join the proceeding 'Schaltposten Meilen' was dismissed, as no connection is apparent.
Considerations
1. No EIA requirement: A turnaround track is not a new railway line (No. 12.1 Annex EIAO). Under No. 12.2 Annex EIAO in conjunction with Art. 10a EPA and Art. 1 EIAO, an EIA obligation for other railway installations arises only where costs (excluding safety installations) exceed CHF 40 million. The lower court relied on the SBB's cost compilation (approx. CHF 27 million, which remains well below the threshold even with a 10% margin of uncertainty). The Federal Supreme Court held that costs cannot be assessed solely on the basis of a detailed SIA cost estimate; a plausibility check of every item is not necessary where the threshold is clearly not reached. The complaint of insufficient establishment of the facts is unfounded.
2. Noise protection: The driving noise of passing trains does not exceed the planning values at the properties; the table in the plan approval shows emissions, not immissions. There is therefore no entitlement to sound insulation measures (Art. 20 and 25 EPA). The stationary noise of the parked trains, according to the EMPA study, is in any event complied with at approx. 120 m; the [D.] plot (115 m) is partly shielded. A specific noise forecast was not necessary, and the right to be heard was not infringed, as the distances were the subject of the proceedings and of the inspection.
3. Precautionary principle and examination of alternatives: Under Art. 11 para. 2 EPA, emissions must be limited, irrespective of existing pollution, as far as technically and operationally feasible and economically viable. Where the planning values are complied with, additional precautionary measures are required only if a substantial additional reduction in emissions can be achieved with relatively little effort (BGE 127 II 306). Art. 11 para. 2 EPA permits only environmental optimisation, not an alternative redesign, particularly where significant new effects on third parties arise (BGE 124 II 517). The demands to dispense with the turnaround track, to extend the S16 or to use track 1 go further than this; abandoning the S20 cannot reasonably be expected of the SBB, and the track extension would not be forward-compatible. The variants 'Bahnhof Meilen' and 'Harbis' require new projects. The 'Wendegleis Süd' variant was assessed by the lower court, after a detailed operational analysis, as not equivalent to the project (more crossing conflicts in the dense S-Bahn network); these findings are not manifestly incorrect. The variant also does not materially improve the…