Facts

On 6 December 2005, an accident occurred on the construction site of the Maladière stadium in Neuchâtel. While precast concrete elements were being installed in the north-east corner of the stands, part of the structure collapsed, injuring two fitters standing on telescopic platforms. [A.] , an employee of [B. SA] , suffered amputation of the right forearm, fractures of several ribs, vertebrae and the femur. Another worker suffered a minor leg injury.

[C. SA] was the general contractor. [Y.] was branch director and principal project manager; [Z.] was the « stadium » project manager and deputy. [X.] was project manager on behalf of the civil engineering firm [D. SA] . [E.] and [F.] , employees of [B. SA] , were respectively technical manager and project manager for one, and assembly manager for the other.

According to the expert report of [G.] dated 22 February 2006, the collapse resulted from overturning instability of a rack beam during an assembly carried out without shoring under the north-east corner. The structure was not stable without shoring at several stages and had to be shored until completion of the roof of the adjacent gymnasium. Supplementary expert opinions were issued in 2006 and 2010, as well as private expert reports.

By judgment of 12 September 2012, the Littoral and Val-de-Travers Police Court convicted [X.] , [E.] , [F.] , [Y.] and [Z.] of serious negligent bodily injury. The Criminal Chamber of the Neuchâtel Cantonal Court upheld the judgment on 9 October 2013, except as to the sentence of [F.] . The Federal Supreme Court, by judgment of 2 September 2014 (6B_1063/2013 and 6B_1069/2013), allowed the appeals of [X.] , [Y.] and [Z.] , annulled the judgment as to them and remitted the case to the cantonal authority, which was to examine which of [B. SA] or [D. SA] was to perform the stability calculations and whether a guarantor position existed.

By judgment on appeal after remittal of 11 September 2015, the cantonal court dismissed the appeals of [X.] , [Y.] and [Z.] and upheld the judgment for the remainder. It held that the structural calculations were primarily the responsibility of [B. SA] , but that [D. SA] shared that responsibility, and that the managers of [C. SA] had a duty of supervision and coordination.

[X.] (6B_1067/2015) seeks acquittal, or alternatively remittal. [Y.] and [Z.] (6B_1077/2015) seek acquittal, or alternatively annulment and remittal for a detailed establishment of the facts and a new decision. The Federal Supreme Court joined the proceedings.

Considerations

The Federal Supreme Court joins the two related appeals (art. 24 para. 2 FCPA and 71 FSCA). As to [X.] 's complaints concerning the establishment of the facts, it finds that the appellant does not demonstrate arbitrariness (art. 105 para. 1 and 97 para. 1 FSCA): he in fact criticises the legal assessment, and the alleged omissions in the summary are not capable of affecting the outcome of the case. The complaint is dismissed.

On the guarantor position, the offence of serious negligent bodily injury presupposes serious injuries, negligence and a causal link, and may be committed by omission if the perpetrator has a guarantor position. The cantonal court correctly analysed the contractual documents (tender conditions, subcontracting agreement, minutes of 25 January 2005, email of 28 January 2005, site minutes), from which it follows that [D. SA] was required to check the entire structural design, including phasing and stability during assembly. The interpretation of the parties' actual intention is not arbitrary. [X.] , as project manager and civil engineer, therefore had a guarantor role towards the workers.

On causation, the absence of complete shoring, due to the absence of stability calculations, is the cause of the collapse. The alleged other causes (removal of the low wall, the shoring of pillars 20C and 20D) are not sufficient to exclude it; had the appellant detected the instability, adequate shoring would have been installed. The natural and adequate causal link is established, and the concurrent fault of [B. SA] and [D. SA] does not break the causal chain, since such faults are not exceptional on a site of this scale. The appeal of [X.] is dismissed.

On the procedural complaint of [Y.] and [Z.] (denial of justice, right to be heard), the Federal Supreme Court recalls that anticipatory assessment of evidence (art. 139 para. 2 CrimPC, art. 29 para. 2 Cst.) and the duty to give reasons are violated only if the decision is arbitrary or insufficiently reasoned. The cantonal court could refuse a further interrogation, the file being complete and the question being legal; the reasoning is sufficient and the right to be heard does not require a response to every argument. The complaint is dismissed.

On the guarantor position of [Y.] and [Z.] , as principal project manager, branch director and deputy, responsible for coordination and logistics, they assume…