Facts

Parties and proceedings: The Swiss Greina Foundation (appellant in proceeding 1C_526/2015) as well as WWF Switzerland, Pro Natura and the Swiss Fishing Association (appellants in proceeding 1C_528/2015) challenged the judgment of the Administrative Court of the Canton of Graubünden of 8 September 2015. The respondent is Kraftwerke Zervreila AG (KWZ). Other parties are the concession municipalities and the Government of the Canton of Graubünden. The appeals were joined by the Federal Supreme Court.

Facts: KWZ operates four power plant stations in the Valser Valley with an average production of around 550 GWh per year. The water rights grants expire on 31 December 2037. The concession project 'Überleitung Lugnez' provides for five new water intakes in the upper Lugnez, a 13 km long tunnel and around 32 million m3 of additional water per year, which yields around 80 GWh of additional production (around 15%). The project is partly located within the BLN object No. 1913 'Greina - Piz Medel'. The Government approved the project on 12 November 2013 subject to conditions; the municipalities of Ilanz and Sagogn had not consented. The Administrative Court dismissed the appeals on 8 September 2015, imposed court costs of CHF 26'663.-- and party compensation on the associations, but rejected the reimbursement of costs for party expert reports (CHF 75'000.--) and own-account services (around CHF 38'000.--).

Requests: The associations requested the refusal of approval and, independently of that, the annulment of the costs and compensation rulings on the ground that the cost burden on the association appeal under Art. 55 EPA and Art. 12 EnA was contrary to federal law. KWZ and the municipalities as well as the Government and the Administrative Court requested dismissal. The FOEN criticised the lack of coordination with the remediation of the existing installations, the insufficient examination of floodplain protection and the residual water quantity.

Key questions: Whether the project is to be treated as a new concession for the entire installation, whether residual water quantities must be increased under Art. 31 para. 2 lit. c and d WPA to protect the Glenner floodplains and fish migration, how surges and sunk flows are to be regulated, and whether the allocation of procedural costs to environmental organisations is compatible with the Constitution and the Convention.

Considerations

Admissibility and concession: The appeal in public law matters is admissible under Art. 82 lit. a, 86 para. 1 lit. d and 90 FSCA. The associations have standing under Art. 55 EPA and Art. 12 EnA. Under Art. 43 WRA, the concession confers an acquired right. The residual water provisions under Art. 29 ff. WPA apply to existing rights only under Art. 80 WPA. A new concession for the entire installation does not exist, since the change is minor in relation to the existing catchment area of around 200 km2 and the production of 550 GWh. However, extending the concession to 80 years effectively prejudges the renewal of the existing rights.

Overall assessment and coordination: According to the case law on the EIA obligation for overall installations (BGE 142 II 20), environmental compatibility must be assessed taking into account all spatially and functionally connected parts. The water abstractions in the Valser Valley and in the Lugnez form an operational and functional unit with shared residual water sections. Art. 9 FishA must be taken into account when applying Art. 29 ff. WPA. Overdue residual water remediation (deadline end of 2012, Art. 81 para. 2 WPA) must be coordinated with the additional concession. For surges and sunk flows as well as bedload (deadline until 2030, Art. 83a WPA), postponement to a subsequent procedure may be justified, provided that the remediation is not prejudiced. The costs are largely reimbursed by Swissgrid (Art. 17d EnO). The contested decision therefore suffers from a significant defect for this reason alone.

Floodplain protection: Under Art. 31 para. 2 lit. c WPA, the residual water quantity must be set so that rare habitats are preserved. The floodplains Caltgera, Inslas and Prada Gronda have not yet been included in the Federal Inventory, but the FOEN considers them to be of national importance. The transitional provision Art. 29 para. 1 lit. a NCHO applies until the inventory is completed, which is why a provisional prohibition of deterioration applies. Exceptions are permissible only for overriding interests of national importance and with protection, restoration and replacement measures (Art. 4 para. 2 FloodplainO, Art. 14 NCHO, Art. 18 para. 1ter NCHA). Party expert reports are to be assessed as party submissions, but may raise doubts as to the completeness of the EIA. The reports from belop, Flussbau AG and naturaqua as well as Lubini show a significant reduction in floodplain dynamics and flood frequency. The FOEN considers these conclusions plausible. The lower court did not sufficiently consider these new elements. The floodplains are already heavily affected today, which is why no further deterioration is permissible and restoration measures are necessary. The national interest in renewable energy (Art. 12 EnA in the version of the Energy Strategy) does not justify the exclusion of new installations in biotopes of national importance (Art. 12 para. 2 sentence 2 EnA) being waived.

Fish migration: In the Glenner, according to the assessment of the FOEN and the cantonal authorities, the passability for sea trout remains ensured with the project. In the Vorderrhein, passability during sunk flow is already not given today. However, the effects of the project are assessed as marginal, and the improvement is to be pursued within the surge and sunk remediation by KWI and KVR. The lower court was entitled to assume this without a violation of federal law.

Surges and sunk flows: Under Art. 39a WPA and Art. 41e WPO, a significant impairment exists in the Vorderrhein. The…