Facts

The Canton of Lucerne plans to reduce the flood hazard emanating from the Dorfbach Büron, which is caused in particular by bed load and driftwood. Planned below the bridge (Risistrasse) is a bed load and driftwood retention facility, along with a track from the Risistrasse for construction and maintenance. The hydraulic engineering project was published in the Cantonal Gazette on 21 April 2012.

[A.] , owner of the partly affected parcels Nos. 336 and 338, filed an objection. The Government Council of the Canton of Lucerne dismissed it on 21 May 2013, approved the project and granted the necessary special and exceptional permits (exceptional permit under Art. 24 SPA, clearing permit under Art. 5 ForA, permit for a technical intervention in a body of water under Art. 8 FishA). The Cantonal Court of Lucerne dismissed the appeal on 11 February 2014. On 10 October 2014 the Federal Supreme Court upheld the appeal because the appellant had wrongly been denied access to the official reports, and remitted the matter (judgment 1C_159/2014).

After renewed examination, the Cantonal Court dismissed the appeal on 4 March 2016, insofar as it was admissible. By public law appeal of 25 April 2016, the appellant requested that this decision be set aside. The Municipality of Büron requested dismissal. The BUWD and the Cantonal Court waived a response. The appeal was granted suspensive effect.

The appellant essentially complained: (1) the flood protection project should have been coordinated with the residual water remediation of the Dorfbach, since about 200 m upstream a small hydropower plant (Tirolerrechen) leaves the stream dry for weeks; (2) the expropriation of his land for an access road is unnecessary, since access could be provided on the opposite side of the stream via a former landfill or via forest parcel No. 556.

Considerations

The public law appeal is admissible against the final cantonal decision of last instance (Art. 82 let. a, 86 para. 1 let. d and 90 FSCA). The appellant has standing as an affected landowner (Art. 89 para. 1 FSCA). The appeal was filed in time (Art. 100 para. 1 FSCA). The appeal may raise violations of federal law, including abuse or excess of discretion (Art. 95 let. a FSCA). The Federal Supreme Court examines violations of fundamental rights, including arbitrary application of cantonal law, only where adequately substantiated (Art. 106 para. 2 FSCA). It bases its decision on the facts established by the lower court unless they are manifestly incorrect or were established in breach of law (Art. 105 and 97 para. 1 FSCA). New facts and evidence are admissible only insofar as the preceding decision gives cause for them (Art. 99 para. 1 FSCA).

On coordination with the residual water remediation: the Cantonal Court examined the location of the bed load trap in detail, based on project documents, the opinion of the specialist authority, engineering expert reports and the report of the FOEN of 20 June 2014. It held the alternative locations unsuitable, in particular because they lie further up in the steep gully section. The appellant does not engage with this. The lower authorities and the FOEN denied a direct connection between the flood protection project and the small hydropower plant. The flood hazard stems from bed load and driftwood, not from the water volume. The bed load trap with slotted barrier does not withdraw water, so the residual water situation does not change. The projects can be realised independently of each other.

The Federal Supreme Court notes that authorities intervening in bodies of water must, where possible, eliminate existing impairments and restore destroyed habitats (Art. 37 para. 2 let. a WPA, Art. 7 para. 2 FishA). Where a fisheries permit is granted, habitat-improving measures must be provided, which may include minimum discharge volumes (Art. 8, Art. 9 para. 1 and 3 FishA). Drying out of the stream would be a serious impairment that also affects the planned section; to that extent a joint examination would be defensible. However, independently of the flood protection project, there is a statutory duty to remediate water abstraction (Art. 80 WPA), whose deadline (Art. 81 WPA) already expired at the end of 2012. The flood protection project is…