Facts

The appellants Pro Natura Schweiz and Pro Natura Thurgau, represented by a lawyer, challenged the cantonal building permit for an agricultural relocation. The respondents, a married couple, operate an agricultural holding that was previously located in the village zone of Thundorf (parcel No. 192). A first relocation application for property No. 199 in the agricultural zone had not been approved in 2008 for landscape protection reasons.

The respondents sold the properties in the village zone and acquired parcel No. 3263 in Wolfikon (municipality of Amlikon-Bissegg). This lies in an area with priority for landscape and special networking functions under the cantonal structure plan. Planned are stables for 40 suckler cows and their offspring, 16 horses and 10 foals, as well as storage and housing rooms; in a second construction phase, a residential building.

A first building application was set aside by the Department of Construction and Environment of the Canton of Thurgau (DBU) on 14 February 2013 following an appeal, as the project was oversized and its long-term viability had not been clarified. A revised second application with reduced building length and a succession agreement with the son was approved by the cantonal Office for Spatial Development and by the municipality. The appellants' appeal was dismissed by the DBU on 25 April 2014, as was the appeal to the Administrative Court of the Canton of Thurgau (decision of 29 October 2014).

Before the Federal Supreme Court, the appellants requested that the decision be set aside and the building permit refused, alternatively that the matter be remitted; they also filed evidentiary requests (production of files, inspection on site). The respondents requested dismissal. The Federal Office for Spatial Development (ARE) requested remittal for a more thorough examination of operational necessity and viability, assessment of the relocation as a single unit, and a comprehensive balancing of interests under Art. 34 para. 4 lit. b SPO. The suspensive effect was denied.

The disputed issues are in particular: the res judicata effect of the DBU decision on zoning conformity, the refusal of the request for production of files concerning parcel No. 869 (possible alternative site, abuse of rights), the balancing of interests concerning the landscape and site selection, and the long-term viability of the holding.

Considerations

The appeal in public law matters is admissible against the final cantonal decision of last instance (Art. 82 lit. a, 86 para. 1 lit. d and 90 FSCA). The approval of agricultural buildings in the agricultural zone is a federal task within the meaning of Art. 2 NCHA, as it is regulated under federal law in Art. 16 ff. SPA and Art. 34 ff. SPO and has a close connection to nature and landscape protection. Appellant 1, as a nationwide nature protection organisation, has standing under Art. 12 para. 1 lit. b NCHA.

The respondents argued that zoning conformity had been finally determined in the DBU appeal decision of 14 February 2013. The Federal Supreme Court rejects this: the statements in E. 5 and 6 of the first DBU decision were obiter dicta, since the decision was set aside without remittal to the municipality and the respondents had to submit a new application. Moreover, even if the question were binding as a preliminary issue, the decision would only be an interlocutory decision, challengeable together with the final decision (Art. 93 para. 3 FSCA).

On the merits, under Art. 34 para. 4 SPO the building must be necessary for the operation (lit. a), no overriding interests may oppose it (lit. b), and the holding must be likely to be able to continue in the long term (lit. c). The operational necessity of relocating from the village zone site was rightly affirmed, but the refusal of the evidentiary request concerning parcel No. 869 constitutes a violation of the right to be heard. The reasons for selling that parcel are relevant, since it could have been considered as an alternative site for an expansion, and the question of a self-inflicted predicament may play a role for operational necessity and the balancing of interests.

The balancing of interests is incomplete: the structure plan entry (priority for landscape, networking function) was interpreted too narrowly, since Section 2.3 of the structure plan text provides special assessment criteria and heightened requirements for the site. The networking function of the parcel was not examined. Furthermore, the requirement to keep agricultural zones…