Facts
The appellants, [A.] and [B.] , on 22 March 2010 formed a simple partnership for the joint management of the agricultural estate of which the first is owner. Plot No. AF 182.01 (current plot No. 2076), located in the agricultural zone at Court, was allocated to him during a land consolidation.
On 4 April 2011, the appellants lodged with the Municipality of Court an application for a building permit for the filling of 5,400 m2 of the plot, with the construction of an access road and the demolition of a wooden building. The municipality forwarded the application to the Prefecture of Jura bernois.
The Archaeological Service of the Canton of Berne recommended refusing the permit, as the project affected an archaeological zone of national importance. After fourteen trial trenches in September 2011, it confirmed in its report of 24 October 2011, and then clarified on 21 November 2013, that the project was incompatible with preservation of the site, in particular the peaty and wet part, where the pressure of the fill and the passage of vehicles risked destroying the remains. The site is the medieval village of Mévilier (12th-13th centuries), a reference site of national importance.
By decision of 27 June 2013, the Prefecture dismissed the application. By decision of 14 May 2014, the Directorate of Public Works, Transport and Energy of the Canton of Berne partially upheld the appeal: it authorised the demolition of the building but refused the permit for the filling and the access road. By judgment of 23 October 2015, the French-language Affairs Court of the Administrative Court of the Canton of Berne dismissed the appeal, on the ground that the conditions of Art. 34 para. 4 SPO and Art. 24 SPA were not met.
The appellants principally request the Federal Supreme Court to grant the permit and, in the alternative, to remit the case. The Directorate of Public Works concludes dismissal, the Administrative Court refers to its judgment, the Directorate of Public Instruction maintains the views of the Archaeological Service, and the Federal Office for Spatial Development waives submitting observations.
Considerations
The public law appeal is admissible (Art. 82 let. a, 86 para. 1 let. d, 90 FSCA), the appellants having standing under Art. 89 para. 1 FSCA. The subject matter of the dispute is limited to the permit application of 4 April 2011; another, smaller-scale filling project not submitted to the cantonal court is inadmissible (Art. 107 para. 1 FSCA).
A building permit may only be granted if the construction conforms to the purpose of the zone (Art. 22 para. 2 SPA; Art. 16a SPA). Under Art. 34 para. 4 SPO, it cumulatively requires that the construction be necessary for the operation (let. a), that no predominant interest oppose its location (let. b), and that the operation be able to subsist in the long term (let. c). The weighing of interests must take into account the aims and principles of Art. 1 and 3 SPA, as well as the interests protected by special legislation; the protection of archaeological heritage constitutes a public interest. Under Bernese law, Art. 10 para. 1 let. e LC/BE and Art. 24 LPat/BE require particular attention to archaeological sites, the remains having to be preserved in the first place; the archaeological inventory has only an indicative value.
The cantonal court found a significant public interest in preserving a site of national importance, whose irreversible destruction was threatened by the filling and drainage, as well as a public interest in directing heritage protection resources to more pressing cases. The appellants' private interest is lesser, as the land remains usable as extensive meadow or litter land, and the need to use an improved plot has not been shown to be indispensable. The appellants merely repeat word for word their cantonal arguments without discussing the reasoning of the contested decision; these criticisms are inadmissible under Art. 42 para. 2 FSCA (ATF 134 II 244 consid. 2.1 and 2.3). Furthermore, the cantonal court correctly held that preservation of the site in situ was possible and that an excavation was not…